Modernization of hot dip galvanizing plant

  • Coating of acid-resistant concrete
  • Pasting of the concrete surface with polyisobutylene plates
  • Pipelines of polypropylene pipes with the use of finished

Overhaul of the heating network from TC 30 to TC 30/1 pos. Factory.

  • The construction of the wall fence pumping station of sulfuric acid
  • Installation  for lining the pits of the sulfuric acid warehouse. mine Semizbay
  • The Installation of the concrete platform of the pumping station of the

"Reconstruction of a sulfuric acid plant with a production capacity of 180 thousand tons per year." Acid Storage Pump

Construction, installation of process equipment, instrumentation and automation equipment

Dismantling works of the building of the ore section "Quartzite hills" and the filtration and shipment section as part of the Complex technical re-equipment of the Aksu gold mining plant JSC "GMK Kazakhaltyn"

Dismantling works in the build

Project: "Reconstruction of the courtyard and street areas of the city of Almaty."

Construction and installation work on the project “Reconstruction of water supply systems with. Zhalpaktobe, Zhambyl district, Zhambyl region ", on the construction site" Water pumping station of the first and second lift. " Installation of contro