LLP "Stepnogorsk Mining and Chemical Factory"

  • Repair work of the building ABK SPP Atbasar
  • Installation of the pump unit 8 / W-P (4) 750-75 РЕТ
  • Installation of the mill GMZ Mill Department
  • Mounting of the thickening scheme of cyanide tailings
  • Construction of a concrete floor with fermentation, a concrete ramp and a drain pit
  • Reconstruction of the gas cleaning system MVG-1,2 desorption site
  • Construction of a temporary platform for maintenance of pipelines PN-1, PN-5, PN-6, PN-7, DR-1 bldg 19 GMZ
  • Fabrication and installation of platforms for maintenance of pipelines
  • Fabrication and installation of platforms for maintenance of pipelines and transfer of DOC to the adjacent room
  • Repair and restoration work on the P-50 thickener, construction No. 98, No. 99