• Organization of a building site and construction camp
  • Inside roads;
  • Construction of perimeter fencing;
  • Installation of metal structures;
  • Installation of solar panels;
  • Installation and switch
  • Laying of the fiber-optical communication line;
  • Construction of the structured cable system;
  • Systems of wireless data transmission;
  • Construction of the data network.

 

Design, implementa

Organization of a building site and construction camp

  • Inside roads;
  • Construction of perimeter fencing;
  • Installation of metal structures;
  • Installation of solar panels;
  • Installation and switchin
  • Maintenance of the roof
  • Overhaul of the car wash unit
  • Works on repair and reconstruction of railway sections
  • Current repair of the roof of the post number #1  station "Industrial"
  • Current repair of th

Program for the restoration of the housing stock and roads of housing and public utilities of Akimat of Stepnogorsk.

Current and capital repairs of houses, educational institutions and kindergartens.

  • Repair work of the building ABK SPP Atbasar
  • Installation of the pump unit 8 / W-P (4) 750-75 РЕТ
  • Installation of the mill GMZ Mill Department
  • Mounting of the thickening scheme of cyanide tailings
  • Cons

Industrial processing of uranium deposits Semizbay. Decontamination point and warehouse of product strippers. Sulfuric acid warehouse with pumping station:

 

Installation of process equipment and commissioning.

Replacement of the main heating pipelines and replacement of the main pipelines of the water pipeline in the educational building in Stepnogorsk, educational zone No. 7, the building of JSC "Astana Medical University".